A PHP Error was encountered

Severity: Warning

Message: date(): Invalid date.timezone value '1', we selected the timezone 'UTC' for now.

Filename: libraries/Email.php

Line Number: 977

Backtrace:

File: /home/appteqin/3dviewengg.com/application/controllers/ThreeDView.php
Line: 7
Function: __construct

File: /home/appteqin/3dviewengg.com/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: date(): Invalid date.timezone value '1', we selected the timezone 'UTC' for now.

Filename: libraries/Email.php

Line Number: 982

Backtrace:

File: /home/appteqin/3dviewengg.com/application/controllers/ThreeDView.php
Line: 7
Function: __construct

File: /home/appteqin/3dviewengg.com/index.php
Line: 315
Function: require_once

Home | 3D View Engineering Consultancy
Services

Some of our expertise

Activity for Skid Packages

  • Mutli-Discipline 3D model of skid
  • 2D general arrangement drawings
  • Fabrication Isometric drawings
  • E&I Skid Engineering
  • Detailed structural fabrication drawings
  • Bill of Materials for piping and Structural
  • Weight and COG calculation for lifting arrangement
  • Lifting arrangement detailed drawings, Lifting Calculations (drawing)
  • Mono Rail Calculations
  • Structural Steel Calculations including Anchor/Foundation Loads
  • Lifting Lug Details
  • MTO for Structure (all structural steel elements including grating)
  • MTO for Piping Materials (including bolts, nuts, gaskets)
  • Piping stress analysis and Structural stress analysis reports

2D Activity for Piping

  • Piping Drawings (including layouts and GAs)
  • P&IDs
  • Equipment Drawings
  • Piping MTOs
  • Pipe Support Schedule
  • Pipe Support Drawings
  • Line List
  • Stress Markup
  • Piping Isometric drawings (Fabrication & Erection)

2D Activity for Civil & Structural

  • Site grading layouts
  • Civil General arrangement layouts
  • Civil Foundation layouts
  • Road & Fence layouts
  • Typical drawings for Fence, Gates, Stairways, Handrails, Ladder, Anchor bolts, etc.,
  • Equipment Shelter & Shed with crane lifting arrangements & its Foundations
  • Equipment Foundation
  • Power supply skid foundation
  • Equipment Supports
  • Pipe Supports/Sleeper
  • Operating Platforms / Crossover Platforms
  • Pipe Rack
  • Collections/Drain Pits & Manholes
  • Cable Trenches
  • Foundations for Windsocks & Light poles
  • Road crossing Culvert for pipes & Cable Duct banks

3D Activity for Piping

  • Equipment Modelling
  • Skid Modelling
  • Piping Modelling Line wise
  • 3D modelling Review & Data Base Management

3D Activity for Civil & Structural

  • Skid Structural Frame Modelling
  • Valve access Platform Modelling
  • Pipe Rack Modelling
  • Civil Foundation Modelling
  • Civil General Arrangement associated Modelling

Activity for Electrical & Instrumentation

  • Skid Structural Frame Modelling
  • Valve access Platform Modelling
  • Pipe Rack Modelling
  • Civil Foundation Modelling
  • Civil General Arrangement associated Modelling

Activity for Electrical & Instrumentation

  • Area Lighting Layout
  • Conduit Layout (Indoor and Outdoor) schedule
  • Grounding / Earthing Layout
  • Lighting luminous intensity (LUX) Level Calculations
  • Grounding / Earthing Conductor Sizing Calculations
  • Instrument Index List
  • Instrument Hook-up drawings
  • Instrument Loop drawings
  • Field Instruments Selection, data sheets, technical particulars, catalogues, make, manufacturer, model, Country of Origin etc
  • Instrument, Cable Routing Layout (Underground / buried and Above Ground routed through cable ladder) and sectional view of cable arrangement
  • Technical particulars of Instrument, cables with cable drum schedules
  • Typical Installation drawings of all Instruments and Components etc
  • Junction Box Cable Termination Drawings

Get in Touch!

Any Question or Business Enquiry? Just write us a message.

Contact Us